WHAT IS CO06,HOW CAN WE DO THE BACK ORDER PROCESSING THERE
Answer Posted / sandy2004
CO06 is used for backorder processing.
Procedure
Access Backorder Processing
1. Call up the backorder processing.
You can call up the backorder processing using the
transaction CO06 The system calls up the initial screen
for processing backorders.
2. Enter the material number of the material to be
processed as well as the plant.
The system checks availability according to ATP logic.
The system calls the overview of backorder processing. In
this screen, the system displays the plant stock or the
storage location stock, the open sales orders or the
dependent reservations and the scheduled receipt elements.
The texts for the receipt and issue elements correspond to
the texts that appear in the MRP list. The various stocks
(individual customer stock, and so on) and the storage
locations are displayed and managed in separate segments.
Processing Sales Orders
The system highlights sales orders or customer requirements
that have not yet been completely confirmed or for which no
receipt has yet been scheduled. The missing parts are
displayed in the column Requirement/receipt.
1. Double-click the sales order or customer requirement,
which is to be confirmed.
In the lower part of the screen, the system displays the
detailed data of the selected sales order for the selected date.
The following data is displayed in detail:
o Open quantity
Total requirement quantity of the sales order or the
customer requirement.
o Material availability date
Date by which sufficient quantities of the item must be
available.
o Total confirmed quantity
Quantity that has been confirmed (in sales order management
when creating the sales order or in backorder processing).
o Confirmed quantity
In this field you can enter the quantity that is to be
allocated (that is, confirmed) in backorder processing.
o ATP quantity
Quantity which can be used when planning open requirement
quantities.
2. Enter the quantity which, according to the ATP
quantity, you can allocate to the requirements in the
Confirmed quantity field.
4. Save your entries.
Note
You can process backorders for sales orders only for
materials for which you have set the indicator Individual
requirements in the material master record (MRP 3 view,
Availability check field).
Dependent reservations, stock transfer requisitions and
stock transfer orders are processed at the same time.
Note
To do this, choose Settings ® Only SD requirements. From the
sales and distribution point of view, backorder processing
can also be set in such a way that only the requirements
necessary for SD are displayed as missing parts. From the
sales and distribution point of view, backorder processing
can also be set in such a way that only the requirements
necessary for SD are displayed as missing parts. To do this,
choose Settings ® Only order reservations.
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
What is the use of customer account group?
Steps of tax determination?
Can you explain what a statistical condition is? Give an example for a statistical condition?
Can anyone please give an example of writing functional specification for a particular situation?If you can't think of it, here is an example : How do we write a functional specification for the FITGAPS raised in the business system? I know a functional spec, is a detailed description. But realtime gurus, pls give a realtime functional spec for such a situation for me to understand more on this.Thanks a bunch in advance!
How higher level item category is controlled?
What is the integrated areas in sd and fi, sd and mm, sd and pp in both implementation and support projects?
What is a 'customer-material information record'?
What are the effects of posting goods issue? Explain.
Explain the concept of ‘sales organization’.
When would you use a sap return order and sap credit memo?
Is it possible to create sales order for 40 items if the quotation is sent for 30 items?
Infostructure filling we have two company codes and new infostructure s004 for filling. We must fill it with data from first cc only. Is there any problem if the people who create orders, deliveries, and billing of second cc work at this time?
What is a plant and how to create a new plant?
Explain the relationship between sales organizations and plants.
Explain what is sap posting period? What is the transaction code to open and close posting period?