What is CMM-1,2,3,4,5 Level Company?
How much levels are there like CMM?
Answer Posted / glamorous
1.Initial: Initial process
2.Managed:Basic project management
Steps in level2: Requirements Management
Project Planning
Project Monitoring & Control
Measurement & Analysis
Process & Product Quality Assurance
Configuration Management
3.Defined:Process standardization
Steps in level3:Requirements Development
Technical Solution
Product Integration
verification
validation
Organisational Process focus
Organisational Process definition
Organisational Training
Integrated Project Management
Risk Management
Integrated Teaming
Decision analysis and resolution
Organizational environment for integration
4.Quantitatively Managed:Quantitative management
Steps in level4:Organizational procee performance
quantitative project management
5.optimising:Continuous process improvement
Steps in level5:organizational innovation and deployment
analysis and resolution
-----------------------------------------------------------
Requirements Development Process
Templates: SRS
Checklists: RD Process, SRS
INPUTS:URD
REQUIREMENTS DEVELOPMENT:Develop product requirements
Analyze and Validate requirements
Use cases development
OUTPUTS:
Develop product requirements
Analyze and Validate requirements
Use cases development
METRICS:Time spent on analysis phase
VERIFICATION:Review of SRS by PM & approved by SDH
SQA reviews the SRS
------------------------------------------------------------
Product Integration Process
Checklist: PI Checklist
INPUTS:
HLD
LLD
SDP
PRODUCT INTEGRATION:
Product integration planning
Product integration testing
OUTPUTS:Integration plan(SDP)
Integration testing
Integration test cases
VERIFICATION:PL and PM reviews the Product Integration items
------------------------------------------------------------
Design Process
Templates: Design Change Request, HLD , LLD
Checklists:HLD,LLD, Architectural Design Review Checklist
INPUTS:
Design constraints
SRS
Change requests
URD
SDP
DESIGN PROCESS:
High Level Design
Low Level Design
Use case diagrams
Sequence diagrams
Data Flow
Physical data base design
OUTPUTS:TS plan
HLD
LLD
METRICS:SQA audit NC
Time spent on design Phase
VERIFICATION:PM verifies and approves the HLD, LLD &
database documents.
SQA verifies the design items.
------------------------------------------------------------
Coding and Development Process
Templates: Unit Test Case, Unit Test Report, Customer
Acceptance form
Guidelines: Coding guidelines
INPUTS:
Project Plan
SRS
HLD
LLD
Coding standards
Design updates
CODING/DEVELOPMENT:Development
Unit testing
OUTPUTS:Code
Code review report
Code peer review reports
Unit test cases
Unit test reports
METRICS:Coding defects
Time spent on coding
Unit test results(Bug reports)
Audit NC
VERIFICATION:PM and SQA verifies the development items.
------------------------------------------------------------
Validation Process
Templates: Software Test Plan, Test Case form, Defect
Report, Test Summary Report,
Tester weekly Status Report
Checklists: Validation Process Checklist
INPUTS:
Managed Code
HLD
LLD
Test Plan
Test Cases
SDP
VALIDATION:
Integration Testing
System Testing
User Acceptance Testing
OUTPUTS: Test cases(UI, functional,
integration)
Defect reports
Test summary report
METRICS:Defect removal Efficiency
Time spent on validation
Audit NC’s
Defect detection rate
Defect Density
Defect injection rate
VERIFICATION:PM reviews the test plan and SDH approves the
test plan
Test Lead and SQA verifies test items
------------------------------------------------------------
Verification Process, Review Procedure
Templates: Peer review log, SRM Review Report, Peer Review
Report
Checklists: Verification Process Checklist
INPUTS:
SDP
MPP
VERIFICATION:
Verification of artifacts
Verification of code
OUTPUTS:Review report
Peer review log
METRICS:
Time spent on reviews
Review efficiency
Audit NC’s
VERIFICATION:PM and SQA reviews the verification process.
------------------------------------------------------------
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
9.Data – driver automation typically includes?
What is the difference between a bug, a defect and an error?
Do you use any automation tool for smoke testing?
tell wat u did in ur banking project?
What type of projects can include in Logistics Domain? and what is the type of domain for project which include Driving license renewal, Different type of title registration etc...
How could you present test strategy for the product testing?
In how many ways you perform batchtesting ?
how to write the test cases for mark as read/unread mails for gmail inbox?and what are the testings we will do?
negative test cases on banking domain ?
Hi All. How can we write negative test cases for Logout Operation ? Please place the answer with a few details and if possible add some related object properties. "A tester exposes his/her ability not only by words he/she also proof it by work"
can u plz give an example for regression testing with example.
pl. give me the list of top jobs website to register i have 2Yrs. Experience in manual testing
can someone give me a brief idea about embedded testing.. i know both embedded system concepts and testing concepts.. i just want to know what we have to do for embedded testing
what does 80hz refresh rate indicates?
Give me an example of something you tried at work but did not work out so you had to go at things another way.