If I need to maintain a PP module in SAP from the
information received from another system, Can i use a table
to create the data required for creating the PP
Answer Posted / mpazos1
It depends ¡¡¡
If you only wants to recover some specific data to create
very easy reports, with a few tables it`s enough. This is
the idea as BW works using Infocubes ¡¡¡
But, if you want to get all improvements you can obtain
with PP Module (capacity requrements, MRP evaluation, ...),
so it's stupid to reinvent the wheel: Use this module ¡¡¡
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
What is pi sheet
Explain how can you create production order without routing and bom?
How to create opbject dependencies in a bom for a configurable material?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
What is mrp controller means?
Which MRP types you have used?
What are the levels of batch, explain batch determination process?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
What is the output of mps run ?
What is the need of mrp list if the stock requirement list is already given?
What is the data you give in SOP
List out the basic procedure for dispatching operations in capacity leveling?
Define ‘bom group’?
What is purpose of schedule margin key?
Mention what is the purpose of using capacity planning?