Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is divercity factor?

Answer Posted / g.v.suresh kumar

(SUM OF INDIVIDUAL MAXIMUM DEMAND)/(COINCIDENCE MAXIMUM
DEMAND)

Is This Answer Correct ?    1 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Difference between Earthing Truck & Earthing trolly for HT panel

4402


What is gain margin?

1090


Is it required to lay 2 runs of GI wires along with armoured cables from one power DB to another Power DB?

1948


please send previous exams question papers

1834


How to define Kirchhoff current law and voltage law along with simply examples.

1776


What is the procedure/activities to be taken to inject the current more than 2000A by using 2000A Loading Transformer?

2010


Which do you think is the most significant cause of energy loss in a factory?

2248


what is the difference between switchgear and circuit breakers and is there any difference between outdoor and indoor switchgear and circuit breakers , and how would you differentiate between switch yard and substation and grid station . thanks

2234


Why we used 690V in ACS 800 drives.Why dont use standard voltage like 415v or 1.1Kv

2460


what is the maximum permissible limit value of leakage current and leakage counter reading to replace lightining arrester?

5141


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2032


completed BE & done apprentice at tneb & having experience 6 years. want to get c license. will apprentiship & BE be helpful for getting c license. will i get any preference by showing this?

1665


how to prepare the technical test

2094


what is the breaking capacity and making capacity of circuit breaker and how

2131


What is the comparison of PILC and XLPE cable

2151