Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what do u mean by knee point voltage?

Answer Posted / rod

Knee point relates to current transformers it is the point
on the curve where it starts to flaten out and the
transformer starts to saturate

Is This Answer Correct ?    9 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I'm generating a pulse of 3V with frequency 80Hz (12.5ms time period) and pulse duration 0.125ms and feeding it to a transformer since i want the pulse to get amplified around 60V. At the output amplification s happening but the pulse is changed to a spike, can you tell me what could be the reason? (an ordinary transformer 220V-12V stepdown transformer is reverse connected ie. now it is 12V-220V stepup and voltage amplification happens)

1870


How do i perform grounding of star point of Genset (400V) for making connection with step up transformer of DELTA-DELTA (400V to 20KV) ? while Genset itself has its own neutral and grounding bus bar inside genset breaker box whereas we have another neutral and grounding busbar in synchronizing panel next to genset at maximum distance of 6meter, would someone pls advice if we can only perform neutral grounding in synchronizing panel or should we ground neutral on both places inside genset breaker box and synchronizing panel.

1727


placement paper samples of mspl company

1925


I have experienced electrical maintenance HT ,but I completed be ECE ....can I apply c license or not ???? Pls help me friend s...

1555


please tell me how a surge protector work on a DC 48Volt.? please describe briefly.

1815


What is the automatic voltage regulator with servomotor?

2019


what r substations?what r there work?why voltages r incresed and then reduced during distribution of power

1913


Can any one know what are the symbols at the down (below) the analog ammeter??? there are 4 symbols which are they ?????

1889


how many types control panel of a 132/33 kv substation

2630


how to design the heater in temperature control unit to heat 50KL of water?

1896


to hook up ten 50 amp rv pedastels at a lenth of 600 feet from the service what size will my service need to be and the size of wire will I have to run to each pedastel in series??????

2072


sir i ve applied for hindustan petroleum and power grid india ltd..and the exams on feb 22.can you pls send model papers and tell how to prepare for those.i need to get into any of these for sure.....

2152


Can 33kva/415v transformer be run underground? If the answer is yes why and if the answer is no why?

1564


How do you determine the size of transformer radiators in a transformer?

1909


A 500 V shunt motor runs at its normal speed of 250rpm when the armature current is 200A. The resistance of the armature is 0.12 Ω. Calculate the speed when a resistance is inserted in the field reducing the shunt field to 80% of normal value and the armature current is 100A.