Answer Posted / cheekati
MRP type-
Key the determines wether and how the material is
planned.you have the following options.
-manual re-order point
-automatic re-order point
-fore-cast based planning
-material requirement planning
-master production scheduling.
LOT-SIZE-
Key that determines which lot size procedure, the system
uses with in material planning to caleculate the quantity
to be procured or produced.
| Is This Answer Correct ? | 19 Yes | 5 No |
Post New Answer View All Answers
What are the various steps of the mm cycle?
List the steps involved in automatic account assignment configuration.
What are the plant-specific data in the material?
Explain cut-over process in sap mm?
What are ‘transaction keys’ while setting obyc?
What is the transaction code to access mrp list?
Why is sap so popular? What are some of the other erp applications available in the market?
What is the 'ean'?
What are some of the options available to transfer materials from one plant to another?
Explain the basic 'organizational structure' in mm?
Where do we define payment terms in po?
What is a 'factory calendar'?
What is the difference between planned and unplanned services?
How are free items managed in a po? You need to tick the tem as free in the po. The price will be zero for such po's.
What are the special stocks in sap?