why ELCB can't work if N input of ELCB do not connect to
ground?
Answer Posted / dayal varma
the main function of the ELCB is to trip the circuit when
ever the fault in earth ocuurs so it needs a ground
referance. other wise it will not work
| Is This Answer Correct ? | 23 Yes | 6 No |
Post New Answer View All Answers
design a 3 bit synchronous and asynchronous counter using T- flipflop
electrical knowelge
Hello everyone, somebody knows what is a "surplice power" ? The hole phrase is: "This rating is appropriate for a generator set paralleled with an infinite bus e.g. a national electrical supply network or grid where the generator set is run at 100% load, 24 hours a day, 365 days a year and any surplice power is exported into the grid" Thanks in advance.
Dear Sir I am living in Jaipur Rajasthan now I did complete my b tech degree in electrical engineering in 2012 Sir how I gate certificate of competency for electrical supervisor
Why is a plain induction motor unsuitable for wide speed control?
what is the minimum requirement gigaohms for the insulation test using 5kv in 300mm xlpe cable
Trafo ratio is 11kV/6.6kv,Vector group is YND11. What will be the effect if secondary is used for earthed system.
where can the transformer having vector group Yny0 be used??
What is notching in dc machine?
We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.
What is the efficiency during maximum power transfer?
what is the effect of connecting three phase supply lines to three phase auto transformer output terminals through a fuse of 10Amp and a circuit breaker (MCB). Is this connection permanently destroy the transformer?
What is the use of iron core in a transformer?
What are reasond for high wattage in single phase induction motors
Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir