Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

On what basis no of earth pits are to be decided either for
transformers or for equipment?

Answer Posted / shvetang

the no of earth pits are depends upon the amount of earth
fault current that occurs during working of any equiment

Is This Answer Correct ?    1 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In vapour absorption refrigeration machine fluids used are

1302


If any one's require of phoenix contact like( relay , termilnal block , surge protection device ) , product please contect me 09878206357 chetan verma

2168


i am going to correct power factor of 1600kw induction motor,when i calculate capacitance of capacitor it is three time more in star connection than delta. if motor is star connected which connection i shall adopt for capacitors and reason for adopt this connection

1896


whatis the commertial spec. of distribution boards ?

2130


A TRANSFORMER 440/400V,DELTA/STAR CONNECTED.THE NEUTRAL CONNECTED WITH GROUND CABLE THAT IS DIRECTLY CONNECTED TO THE PANEL,FROM PANEL IT IS CONNECTED EARTH PIT.IS IT RIGHT? IF IT IS RIGHT LEAKAGE CURRENT AFFECTED.SECONDATY IS PROTECTED WITH EARTH LEAKAGE RELAY.

2172


How can you sized or estimate the ligthning arrester current rating?

2188


im working in one private compeny in gujarat. i was complet diploma electric in 2010 from gujarat technical board. now i want electric supervisor licence in gujarat but i dont't know when i apply? plz give me address of the licence dippartment office in gujarat. gandhinagar

1912


High voltage test procedure of in swgr board. why should measure millivolt drop on testing time?

2157


why Lightning arrestor are made by 2 seperate stack of inslutor but why cvt are in single stack of insulator.

2030


Inverter. converter. Ups.MCB.solar.alternators. motors.

2073


How do we calculate transformer oil in liter from the rating of the transformer.

1719


Explain The Application Of Storage Batteries?

1204


block diagram of 2 ups system connected in parallel mode?

2121


draw the block diagram of fire alarm?

5474


what is the preventive maintence for ht panels and busbars and vcb abd acb's.

2432