Answer Posted / manickam
DEMAND MANAGEMENT-MPS(PLANNED ORDERS)-LT CAPACITY EVALUATION
(FIRMED PLANNED ORDERS)-DETAILED SCHEDULING(PRODUCTION
ORDER)-MRP(REQUIREMENTS)-
1.PRODUCTION ORDER RELESE-PRODUCTION ORDER CONFORMATION-WIP
DETERMINATION-G.R/G.I-RECORDING-SETTLEMENT-
ARCIVING&DELETIONS-MASS PROCESSING.
2.PURCHASE REQUISTIONS-PURCHASE ORDER-GR
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Where we have to specify the teardown time in one operation?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
Mention what are the keyfields found in mrp view 1?
What is routing in sap pp?
Explain why there is need of production version?
How can I use variable size items?
Explain the mrp group and their uses.
What is primary cost and secondary cost?
Difference between byproduct and co-product.
Difference between base unit of measure, production unit, order unit
What is Backflush, the places where the backflush is used?
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
What is sla (service level agreements)?