Answer Posted / biswapriya mazumder
mix design unlike nominal mix is the method of fixing the
proportion of the cement,sand, coarse aggregates by certain
equations based on trial and error to get the desired fck
value,where fck value is that value where not less than 5%
of the test results are expected to fall.i have seen this
method being used at a L&T site quality control department.
| Is This Answer Correct ? | 11 Yes | 5 No |
Post New Answer View All Answers
How do you calculate the unit weight of concrete?
how to calculate the size of triangular ring in rcc column?
What is the quantity of cement in mix m20 concrete?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
Why the finite element method is lower bound solution?
Please design 12.5m long dubbly beam
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
very simple or less time consuming formula for reinforcement calculation by moment
how clculate excavated or backfilling quantity by simpson's rule
reinforcement slab, beam and column formulas?
What is missing report and how to prepare
Aptitude, reasoning, quants, verbal and technical question
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What is the density of DLC & PQC and how it is differ from normal concrete?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??