Based on CPI/CGPA they shortlist the candidates & than
directly start Interview so there is no Written Exam or GD
Only PI.Interview held @ MNNIT , ALLAHABAD On-Campus on
6th,Aug, 2007 & the Questions asked to me by Interview Board
( 4 People) are from HR/SummerTraining/BTP/Subject-core,
POWER SYSTEM & MACHINE. time duration of I/V is about 15-20
Minutes.

HR-

Q.1 Name,hobbies & About family background ?

Q2.What u know abt NTPC ??

Q3.Why u want to choose NTPC as ur Carrier's starting i.e
power sector not any other Oragnisation or sector ??

Techincal Questions-

Q1.What is the reason for transformer Noise ??

Q2.Which material is used for making Transformer oil & How u
measure its dielectric strength & Name the test ?

Q.3 Which Machine u will prefer 2 use if flammble gases are
coming out at a place & why ??

Q4.What is relation b/w Transmission Lines & Communication
Lines ?

Q5.What is the maximum capacity Synchronus Machine & total
powerGeneration in our country ?

Q.6 In india Power generation is at 50Hz while in America
its 60 hz ,why so ?? Advantage or disadvantage ??

Q.7 Maximum Generation Voltage in india ?

Q8. What is the Voltage regulation & why its required n how
much is permissible ? & causes of voltage variation ??

Q.9 Why electric shock is feel ?? n in a Electric Train why
we didnt feel that ?

Q.10 Have u seen/ experience of any power plant/ industry
related to the power sector ?

so these are the questions which not too diffcult i
think was asked to me.

Answer Posted / sriman

can u give me the answers for Q5, Q6, Q9

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is servo lock in CNC how they work and if any parameter for them in CNC machine

4788


Explain (in simple ) - root mean square. whats its role in electrical fundamandal.where its used

1806


HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.

1753


Single phase and threephase power calculation

1650


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?

1398






is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.

1172


How colour picturetube works & how many year it will works.

1571


direction of tarbine& genrator

1618


In Power cable specification what is U0/U and Um.

3210


Explain Even and Odd signals?

1424


What are factors to be considered while we selecting the Core Balance Current Transformer for Earth fault protection

1429


What is the general system requirement of alternator?

1319


What are the basic & Majour problems in UPS ?

1597


Explain what is use of lockout relay in ht voltage?

672


We have two APFC panels in same station. I need how to connect CT in two APFC panels.can we take one CT in series connection or two separate CTs.

980