Answer Posted / sanjeet swarnakar
grid means national interconnection of power supply with
all the states
please tell me ur email ID
my email ID is sanjeet.swarnakar@gmail.com
| Is This Answer Correct ? | 9 Yes | 10 No |
Post New Answer View All Answers
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
what are the safety measures of induction motor?
What is the efficiency during maximum power transfer?
what exactly commisioning work does in electrical site work... LT side?..
transformer spections :: input voltage 0-110-230v; output volage 0-10-12-14v; amp=3A using CRNO CORE, capcaity=50VA primary turns = ? ; secondry turns =?
when measure the core loss of three phase distribution transformer or three phase reactor loss, one phase shown negative watt loss. why??
Can the output voltage of a rectifier be greater than the input AC voltage without the use of any voltage multiplier in the circuit??please provide the explanation too..
What is the gross weight to copper ratio in slip ring induction motor of 4000 HP,6.6 kv, 372amp, 992 rpm GE motor.
Where can I get CPWD electrical specifications & Shedule of rates? Please help me
what will happen if ac and dc supplies given
what is difference between elr and R eartl realy.
Define reserve-generating capacity?
If short circuit ratio is high is it bad or good for a machine then tell the reason...
i am completed diploma in ece,and working in ht and lt lines.so is elligible diploma in ece for get electrical C Licence?plse give ur opinion?
For an induction motor wat is the loading/unloading cycle duration or interms of L/UL ratio/ percentage?