adspace


what is SHEAR WALL ? why and where it is provided.

Answer Posted / uday tank

Shear wall is the wall which provides to resist the shear
force in the structure.
Where shear force or moment act
To resist shear force

Is This Answer Correct ?    24 Yes 47 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3236


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1921


What is Density of cement, sand & aggregate ?

1610


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2241


what is the difference between replacement of cement by groundnut shell ash

3306


400 ku d/c clearess ketan hota hai?

2124


Which is the latest version of solidsworks?

1343


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

2059


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2233


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1896


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

2104


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1618


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

5528


please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.

2397


What is the per cu. mt. price of ready mix in Gujarat region.?

2429