what is difference between group BOM and BOM group ?
Answer Posted / mukesh bafana
A bill of material that is not assigned to a plant.
A group BOM is valid across the entire company.
Special features of group BOMS:
A plant check is not carried out for the materials in a
group BOM.
A group BOM is not exploded in material requirements
planning and in the production order.
Group bills of material are mainly created in the design
phase and then later assigned to one or more plants for
production.
A collection of bills of material that lets you describe a
product or a number of similar products.
The following bills of material comprise a BOM group:
All the variants of a variant BOM
All the alternatives of a multiple BOM
| Is This Answer Correct ? | 30 Yes | 3 No |
Post New Answer View All Answers
What are traffic lights in mrp?
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
What is known as 'demand management'?
What is the use of mrp list?
Explain what happens to planned after it has been converted into production order?
What is internal payroll process?
Explain 'mrp' (material requirements planning)?
Scheduling times can be defined in the material master record by?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What are the types of master views for production and planning?
Mention what is the production process in sap?
In project the customization is comes under which phase?
What is the uses of production scheduling profile and what the configure have you done current project
How to create PRT master record?
SPRO path for order, confirmation or requirement class.