Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is integration points between sd AND MM?

Answer Posted / surya

1. Assign sales org ,distri and plant.
2. plant and storage location.
3. MRP
4. Availability check and Tor.
5. When you create a sales order all the items are copied
from material master .
6.While creating inbound or outbound delivery shipping
point take place .
7.The material which you enter in ales order must be
extend to your salesarea of your sales order othere wise
system will not transisit with that material

Is This Answer Correct ?    7 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance

1695


Infostructure filling we have two company codes and new infostructure s004 for filling. We must fill it with data from first cc only. Is there any problem if the people who create orders, deliveries, and billing of second cc work at this time?

1218


What is an mrp type?

1105


How you can extent the rebate? What are the procedures, what is the customisation for it?

1118


sd validation of advance payment. eg sales order(1234) raised on 14 jan 2012. validity of sales order is 30 jan 2012 advance paym should receive before 25 jan 2012 any payment against this order should not be received after 26 jan 2012

2094


how to configure Supply chain management

2147


How can a customer can connect his SAP ECC system to his SAP CRM system

2020


To what do you assign distribution channels and divisions?

1062


Do I have to change the update rules/source fields for the infostructure?

1073


Hi,In transportation while am creating shipment cost document am getting this error "forward shipment cost items incorrect" kindly any one answer me.thanks in adv

5344


How can one inactivate or block a special stock partner? Intent is to disallow transactions to this consignment location as part of lifecycle mgmt.

1926


What is the purpose of 'output determination'?

1131


What is material determination? Can you do two materials for one material?

1056


A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system

1914


Does sap transportation management have load planning capabilities? : transportation management

1153