1. I have 2 universes. that is u1 and u2. From u1,i created
one report that is r1. Now i want to give the connection r1
to u2 and at the same time delete the connection from u1 to
r1 ? How is it possible explain?
2.How can i schedule the reports in BOXIR2?
Answer Posted / sri
Hi everybody,
we can change the connection of a
particular report in the report level option tools->view
data->Browse of universe option,here we can change the
connection of the report and we connect to any valid universe.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is the functional & architectural differences between business objects and web intelligence reports?
How to execute the plsql procedure from the report by clicking with mouse?
Which versions are used in the bo dashboard work?
In source system we have os - windows BO - 5.1.5. with webi 2.7.1 Repository database - oracle Reports database - Oracle and DB2 Nearly we have 1200 reports in present system , i want to move as it is to new hardware os- windows bo- 5.1.5 with webi2.7.1 repository - oracle reports - oracle and db2 let me know is there any migration techniques in same version. thanks in advance Usha
Explain what three things do you consider to be the most important factors for a manager?
What is package in BO
Explain the difference between detect alias and detect context?
is it possible to export the webi reports to crystal reports?with out using businessview?
what will be the contents for a functional requirements specifications
Are data mart and dwh normalized or denormalized? Do both of them exist in the same tier?
how get the grand total in master-detail report?
What Is The Difference Between Oltp And Olap?
How to Explain about BO projects in interviews?(in Banking,insurance,Manufacturing domains)
U r project in which stage in implementation?
What is the difference between business requirement document and use case document.