What is mean by sdlc and expalin spiral model and proto type
model?
Answer Posted / joe
SDLC MEANS SOFTWARE DEVELOPMENT LIFE CYCLE.
IN THIS WE HAVE FOUR MODELS
1.WATERFALL MODEL
2.PROTOTYPING MODEL
3.EVOLUTIONARY DEVELOPMENT MODEL
4.SPIRAL MODEL
5.SYNCHRONIZE-AND-STABILIZE MODEL
PROTOTYPE MODEL: THIS MODEL IS APPLICABLE FOR THE COMPANY
WHEN THE USER CUSTOMER REQUIRMENTS ARE NOT CLEAR.WHEN THE
PROTOTYPE IS DEMONSTATED TO THE USER,THE USER GETS CLARITY
OF THE FUNCTIONALITY OF THE SOFTWARE AND SUGGETS REQUIRED
MODIFICATIONS.
PROTOTYING IS GENERALLY REQUIRED TO OBTAIN USER INTERFACE
REQUIRMENTS,BASED ON THE FEEDBACK, A MORE ACCURATE SRS
DOCUMENT CAN BE PREPARED AND THE DEVELOPMENT WORK CAN
START,USING THE WATERFALL MODEL.
SPIRAL MODEL: THIS MODEL IS APPLICABLE FOR THE COMPANIES
WHEN THE USER REQUIRMENTS ARE INCOMPLETE.IN THE FUTURE,THEY
MAY GET SOME REQUIRMENTS.THIS IS USEFUL FOR HIGH-RISK
PROJECTS.
EACH LOOP IN SPIRAL REPRESENTS A DEVELOPMENT PHASE
1.PLANE THE NEST PHASE
2.OBJECTIVES ALTERNATIVES CONSTRAINTA
3.SRS
4.DESIGN
5.DETAILED DESIGN
6.EXECUTION
7.RISK ANALYSIS EVALUATION OF ALTERNATIVES
EACH LOOP IS SPLIT INTO FOUR SECTIONS,ONE FORM HAS TO BE
FILLED CONTAINING THE FOLLOWING
A. TO DETERMINE THE OBJECTIVES,ALTERNATIVES,AND CONSTRAINTS
B. RISK ANALYSIS ABD EVALUATAION OF ALTERNATIVES
C.EXECUTION OF THAT PHASE OF DEVELOPMENT
D. PLANNING THE NEXT PHASE
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
What is date driven testing?
!what are the entry criteria for antomation testing ?
Difference between adhoc testing and error guessing?
Can Anbody please send me Daily Work status format in which I can save my daily work activity
What are the cases why parameterization is necessary when load testing the Web server and the database server?
What is coverage and what are the different types of coverage techniques?
What is mean by incident logging system ?
What is data flow diagram?
If anyone have attended interview with deloitte for the post of senior manual test engineer. Please share the interview process and the questions asked. How to prepare for the interview. Thanks in advance
What are the different types of integration testing?
How quickly we need to fix the bug? Or how soon the bug should get fixed?
What is the difference between system testing and integration testing?
What is neutral test case?
send the senario template
what are the tests u did in entire project? when it did in the project? (means at the release build to end of project) plz explain clearly