Rotor is taken away from three phase induction motor and
three phase supply is given to the stator.What will happen?
Answer Posted / a.kossay
IF THE ROTOR TAKEN OUT WITH THE MAGNETIC CORE NOTHING WILL
HAPPEN, ONLY THE MAGNETZING CURRENT WILL INCREASE BECAUSE
THE MAGNETIC FIELD WILL HAVE TO ROTATE IN AIR WICH HAVE A
HIGH RELUCTANCE AND OF COURSE THE THE COIL INDUCTANCE IS
INVERSILY PROPORTIONAL WITH THE MAGNETIC RELUCTANCE SO IT
WILL BE SO SMALL RESULTING IN HIGH MAGNETIZING CURRENT
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
how to calculate maximum current
is ac supply can store
Classify driling machines.
hi frnds can any one help me ? plz send me placement paper of IOCL of Electrical streem .... plz send ....its urgent....
What is an iron loss or core loss pi?
Dyn1 transformer vector group testing how to do
Why derivative controller is not used in control systems?
plz tell me,ht and lt panel terminals in substations explain beiefly
how unidirectional torque is produced in DC motor?
1)we have 1000 cfm Blower,Dia-1Mtr,Velocity of air 94 m/s 2)We have Natural Air velocity 94m/s 3If i Put Wind Mill in natural air ,speed is 94m/s Then it will generate Assume 100kw 4)If i put same wind mill across the Blower,air speed is same 94m/s now the Question is Will it generate 100 kw?
i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.
hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .
what are the sample questions asking to the test cunducting for electrical superwising lisence test?
Either It Possible a dc Motor to Run On Ac Drive [ Ex : ACS 800 , Yaskawa F7 ] If it is Possible How Pls Inform Me dinesh_elect_eng@yahoo.com
why we use Test Terminal Block in 11 KV and 33 KV electrical panels.