For an 100kw generator, only 50kw of load is connected.
will the generator generate only 50kw or 100kw. if it
generate 100kw what happens to rest of the 50kw. what
happens if we connect more than 100kw of load?
Answer Posted / rvg.msceb
Generator is only an energy converter. The generator rating
100KW is specified is max. rating with pf. of 0.8( as per
manufacturs std.)
During the starting no DG set runs with full/partial load.
and it just generate the power required to meet the losses
only. Once after we connects load, it will generate power
required to meet the losses and output. The same equivalent
amount of mechanical power will be consumed from the prime
mover according to the efficiency of the system. So there
is no such question of 50KW energy wastage. Ultimately,
governer of prime mover plays an important role over DG
set.
if we connects more load say 200% of full load, for a
specified time according to the insulation and winding
temperature and prime mover output capacity, the DG can
function, say max. 2-3 minutes. Beyond that, DG will be
shutdown because of higher temp./or out of synchronism.
| Is This Answer Correct ? | 31 Yes | 1 No |
Post New Answer View All Answers
Whether should be the oil level in OCTC transfomer? It should be upto winding immersed completely or should be upto tap changer s/w? How it will affect the performance of the transformer. Rating may be 33KVA
what is the role of energy meter in distribution system ?
What is time invariant system?
How would your past experience translate into success in this job?
How I calculate the ELCB for circuit breakers?
Draw the vector diagramme for Asynchronous Induction Generator at noload,half load and fullload.
What does the kvar means?
71ohm,111ohm,95ohm,179ohm in calculate the total ohm in series circuit
what is the profesional board for electrical engineer what is thepast and during construction for electrical engineering
Is there any problem about which the drive (inverter) doesn't show/display the alarm and/or fault but instead of this , it doesn't work ? I want to know that could there be any kind of problem in the drive when the drive doesn't display the alarm and/or fault ?
how we can decide that what value of ht line will come to any commercial building? (ans except According to the building load)
what is the Connected Load (kW) or Contract Demand (kVA)of mahindra nasik plant??
what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?
What are the different types of dams?
Give the topology of current amplifier with current shunt feedback?