Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Do you know how to joint the H.T and L.T Cables?

Answer Posted / dilip b shah

H.T cable joint can be done by two method.
By Heat shrink kit or by m seal kit.If cable is unearth
prefere to use heat shrink kit. in earth cable prefere to
use m seal kit.
Two L.T Cable joint done by m seal kit(low voltage kit)
and end termination done by bimatalic lugs.

Is This Answer Correct ?    22 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit

1821


What is a dominant pole?

1111


Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???

1928


solor panels arrange some angle,panel is flat fitted energy was produced or not why?

1852


If a high resistance fault occurs,then what are the changes will happen in the system?

1396


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1739


How many types of faults are there in 3 phase power system?

1026


What are the three constants associated with a steady state error?

1164


what are the usual topology of transformers at different substations in the power system and why that particular topology is choosen. what are the limitaions of that topology?

2057


What is an iron loss or core loss pi?

1049


How we can defined theecopper cable size if we know the aluminium cable size?

1812


I am going to appear for the RRB Chennai Section Engineer online exam. Please send me the question papers from 2001 to date to my mail id:upendrakrishna20@gmail.com,plz send me ,or send any other rrb papers plzzzzzzzzzzzzzzzzzz

2037


give me applications of sequence bridges . (used in 3 phase un balanced systems)

1917


How we calculate the current carrying capacity of H.T. cabel?

2185


how to find the voltage's of a transmission line plzz help with pictures i am not able to understand

1297