I HAVE CONSUMER WHOSE POWER FACTOR IS 65% I WANT TO INCREASE
IT TO 98%.HOW TO CARRY OUT?
Answer Posted / zahid noor
Now a days Automatic Power Factor Control Panels can be
easily purchased from Panel manufacturer by providing them
the details of load, voltage level, current etc & existing
PF , can contact m/s Universal cables Satna, M/s L&T
Switchgear, and some local manufacturers can also supply as
per requirement.
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
The metal-enclosed switchgear and controlgear is subdivided into three types: 1. metal-clad switchgear and controlgear; 2. compartmented switchgear and controlgear 3. cubicle switchgear and controlgear. What is the main differnence between them. State some example.
which protection used in power plant?
If we connect a motor and generator together (I mean that the generator gives the motor electricity and the motor gives the generator movement) regardless the losses. Will the generator still generate and the motor still move?
Can u explain : what is supply for train (whether a,c or d.c ).I know that supply is 25000v a.c .But there is rumour that supply is D.C. And also explain how lights and fans inside the trains are working ,and what type of motors are used in trains whether D.C motors or induction motors .If d.c motor, how it gets supply.If traction motors are used then what are traction motors and its functions and how it differs from other motors and also explain about locomotive . y d.c series motor in train.train wheels r driven by D.C shunt motor ,at what voltage,and at what speed. please reply..............
What is Icu and Ics and what is difference b/w them. please tell me how to calculate a size of a copper bar for a system or a breaker... reply on... king.arish@gmail.com would be waiting for a logical answer.
What is miller crystal oscillator? Explain its operation?
What is BusBar integrity test and how it is conducted?
What is relation between transmission lines & Communication lines ?
what is allowable ac mixing in dc
im working in one private compeny in gujarat. i was complet diploma electric in 2010 from gujarat technical board. now i want electric supervisor licence in gujarat but i dont't know when i apply? plz give me address of the licence dippartment office in gujarat. gandhinagar
Why can't we parallel the secondary circuits of two voltage transformers?
What is meant by cold loop test in instrument
How they LT panel busbar size choose
what is ic 01,ic 06 ?is it types of cooling?
if a 3phase 100kva distribution transformer , 400 v,50 hz, 4-wire system is loaded at 160 k.w mostly 1-phase Lighting & Airconditioning split a.c load what will be the net effect on the power system in terms of voltage, powerfactor, current , efficiency of xformer