WHAT ARE THE STAGES U WILL USE IN IMPLEMENTING SCD2/DATE
FIELD
Answer Posted / kiran
Hai..,
This is Kiran.
In SCD's type we r using change capture and transfernar
stage.
date fields are using in target level as Eff_start_date and
Eff_end_date.
Eff_start_date=current date
Eff_end_date =Currentdate-1.
If any mail me
Regards
Kiran
9393363309
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
what is the custome stage in datastage? how can we impliment that one? plz tell me
What is "fatal error/rdbms code 3996" error?
How many areas for files does datastage have?
what is the use of surogate key in datastage
Difference between in process and inter process?
Differentiate between data file and descriptor file?
What is the precedence of stage variables,derivations, and constraints?
if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?
What is staging variable?
What are the different layers in the information server architecture?
Can you explain repository tables in datastage?
What are system variables and sequencers in datastage
What are the features of datastage flow designer?
In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?
How the ipc stage work?