Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What type of tranformer generaly at soft wares like
capacity 2000 kva 1800 kva etc iam confused it CT or PT
OR distribution tranformer

Answer Posted / ankit

Actually you are confused in the ratings:
A CT i.e. current transformer is used as an instrument
transformer to measure current.

And Similarly PT i.e. Potential Transformer is used for
voltage measurement.

The ratings specified by u are the nominal ratings of a big
building like Mall, IT park so the transformer is A
DISTRIBUTION X-MER which is used for meeting the load
requirements of that premise.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is an ideal transformer?

1139


What is mean by hot and cold loop testing? What is the difference between them?

1098


how point on wave controller works.

2579


WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.

1894


excitation limit of an excitor

2031


Salient pole alternator is more stable, why?

2687


PLEASE SEND THE PREVIOUS YEARS QUESTION PAPERS OF RRB JUNIOR ENGINEER-ELECTRICAL

1872


Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

1913


What are the advantages of stationary armature and rotating field system?

1204


Generation of voltage for each phase are same of a turbogenerator.Although the short circuit current flow when two phase of turbogenerator are shorted(where current can't flow without potential difference),why?

2102


what is Fan Control Cubicle

2453


Pl. brief about break-down maintenance of machine tool.

1787


any idea abt REVERSE METERING concept.........?

2219


how to define tell me about self

1983


PIU how does work?

2416