A is sister of B. C is brother of D. D is sister of A. How
is B related to D?
(a) Brother
(b) Brother or Sister
(c) Sister
(d) Data inadequate
(e) None of these
Answer Posted / sanooja
b
Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
A father is 30 years older than his son however he will be only thrice as old as the son after 5 years what is father's present age ?
sir i need rrb secunderabad goods guard previous exam model papers
A person travels 6km towards west, then travels 5km towards north ,then finally travels 6km towards west. Where is he with respect to his starting position?
The population of a city increases @ 4% p.a. That is an additional annual increase of 4% of the population due to this influx of job seekers, the % increase in population after 2 years is
write a program that prompts the user to enter three sides of a triangle and prints whether it is a right triangle or not.
A Flight takes off at 2 A.M from northeast direction and travels for 11 hours to reach the destination which is in north west direction.Given the latitude and longitude of source and destination. Find the local time of destination when the flight reaches there?
. Which of the following is not a VSAM dataset. a. KSDS b. RRDS c. LSDS d. ESDS
Pipe A can fill a tank in 30 mins and Pipe B can fill it in 28 mins.If 3/4th of the tank is filled by Pipe B alone and both are opened, how much time is required by both the pipes to fill the tank completely ?
Find the missing number in this series? 8 2 14 6 11 ? 14 6 18 12
25 stations ,24 stations are inbetween- - - - - how many tickets should be required.
Sunny ate 100 apples in five days, each day eating 6 more than the previous day. How many apples did he eat on the first day?
Find the difference of the minimum number of numbers required to form every number from 1 to 1234 and 1 to 4321.
Find the Next Series Nuumber 21, 463, 687, 238, 1134, ----
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)
the program requires 4000(n)1/2 [ie square root of n].if size of program was increased by 1% then calculate the percentage change in size of program.