Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How do you maintain the earthing resistance?

Answer Posted / kumarabharathi

Earthing Resistance can be maintained by adding
water,charcoal & salt per month,Not only by adding those
three, Its rusted bolt& Nuts must be renewed by new one for
every three month,this maintenance should be varied depand
upon the climatic conditions, such as in rainy season.Earth
pit must be fenced with cement.

Is This Answer Correct ?    66 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate the no load current in transformer?

2477


HOW MUCH CURRENT DOES SYNCHRONOUS MOTOR TAKES AT SYNCHRONOUS SPEED IN NO LOAD CONDITION ?

1813


Explain the working of any one cutting machine

1053


What are the roles and responsibilities of electrical engineer in cement plant

1992


What is rotary phase converter?

1056


Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.

2777


for what voltage will reactive power be largest in 380 kv line : a) 375kv b)380kv c)385kv

1430


i karmveer bharti persuing b.tech . plz send me syllabus and name of reference books. for preparation of section eng.

2084


What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.

1930


why servomotor motor? where i apply for best output?

2005


hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.

1961


what may the reason for vector shift in a generator?

1838


orifice sizing how done, checking & selection

1903


How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???

2249


WHY L-G FAULT IS MORE SEVERE IN TERMS OF RRRV?

3147