Answer Posted / jinu
the major difference in between sap r/3 and APO is that in
sap r/3 excecuting of production orders or purchase
orders,material withdrawal and costing takesplace,whereas
in apo only planning can be performed,
Sales orders are only created in SAP R/3 whereas in APO it
is not created.
IN APO planning is done for the critical materials using
MRP type X0.
| Is This Answer Correct ? | 20 Yes | 1 No |
Post New Answer View All Answers
Define standard cost
In cost controlling information system mention the fields that are listed in the list screen of the report?
Explain variant configuration
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
How many levels of Flexible Planning are there?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
How to group employees for their allowances in payroll?
Explain the stock requirement list and their uses.
List out the basic procedure for dispatching operations in capacity leveling?
What is the output of mps run ?
What is the use of mrp group?
list the important tables used in pp.
What is group bom?
What is Planning time Fence?
In sap-pp what are the costing parameters?