Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is npsh and how to calculate it for a centrifugal pump

Answer Posted / p.manikandan

NPSH is the acronym of Net Positive Suction Head, there r 2
NPSH one is NPSH(a) and NPSH(r) i.e., NPSH available and
required. Always NPSH(a) should be higher than the NPSH(r)
this NPSH(R) will be determined my the pump manufacturer
itself.

TO calculate NPSH(a)
NPSHa = Atm. pr.acting on the liquid + static head - vapour
pressure of the liquid- pressure
loss in the suction piping - pressure loss due to the
suction strainer.

Is This Answer Correct ?    90 Yes 17 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which parameter remains constant in a throttling process ?

1211


Which material amoung EN8 and EN24 should be selected for the designing of the shafts of rotary kilns

1518


HOW TO calculate steam velocity on boiler o/l ?

2247


Name the boiler that does not need a steam drum.

1216


Thermo dynamics,Mechanics,Machine design,Design of machine members,dom,tom,strength of materials

3651


what is procedure of measuring operating length of mechanical seal . (in case of centrifugal pump)

2300


How do you reset the circuit breaker?

1966


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1810


why does bitumen heated from top side bt not from bottom side€

2437


How to calibrate Vacuum Gauges if you don't have any standard gauge available with you? please suggest procedures for calibration of Vacuum gauge like pirani gauge ,cold cathod gauge,thermocouple gauge without any standard gauge.

2776


What is a process flow diagram?

1098


What are the basis on which the best material for sliding contact bearings manufacturing?

1065


WHAT IS A TR REQUIRED IF AIR FLOW 6500 CMH COIL INLET TEMP 7 - 12 DEGREE C AIR TEMP INLET - 18 DEGREE C & REQUIRED TEMP IS 12 DEGREE C

3621


What do you mean by the term thread size?

1079


Name the sheet metal hand tools?

1076