Answer Posted / vinay
# 1 material master,BOM,Workcenter and routing
and MRP
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What is Backflush, the places where the backflush is used?
What is internal payroll process?
Explain what is the meaning of exploding a bom?
What is Planning time Fence?
Which tool you are using
What is costing? How it is affected the pp?
Explain why there is need of production version?
What is the uses of production scheduling profile and what the configure have you done current project
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
what is alternative item group
Explain the Difference between the Discreet and REM.
Define mrp controller
What is MRP procedure
What is it 41 used for?
Which MRP types you have used?