Why we do design mix of concrete when there is nominal
method using the IS-Code available ?
Answer Posted / sudheer
To acheive best possible concrete with the ingredients
available at particular location design mix is used.
| Is This Answer Correct ? | 17 Yes | 1 No |
Post New Answer View All Answers
Explain why concrete barriers have curved surface profiles?
what is idealized curve for concrere and steel
How to hide dimensions in autocad?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
What is the effect of a building collapse?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
why we use 19x9x9and 20x10x10 but not other
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
How to fix toll charge for a particular vehicle at toll booths in a highway?
how to nfind out the specific gravity of sand.aggregate,water please help...
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
What is soil enforcement?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal