Answer Posted / satya dev ( knight frank)
In that question, the follwing factors are not mentioned
for what current load u are selecting the cable size---??
for what the calbe length using for system---????
for what type of load has to be conneted--/?????
If above factor are availabe then we can claculate the
same. there is no exact formula to calculate the size of
cable without all above factors
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason
Please sent me some previous year question papers of BSNL-JTO telecom and RRB in ELectrical Engineering to varshashahi@yahoo.com
hai friends i have BSNL JTO exam on next month so if any body have model question paper or give preparation tips to my mail id kumar4486@yahoo.co.in this will helpfull for my future .plz & thank u by kumar
hello!my name is sheikh iam preparing for indian engineering servieces,please send me the old question papers..to sheikhshaazforjobs@gmail.com
What is the magnetic field (coil DC ) of Turbo Expander?
Draw a SLD of DG distribution up to main LT panel?
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
Sir, I have applied for the of Assistant.engineer of NPDCL. please send me all AP TRANSCO AND JENCO solved papers of previous exams . I requested send me the papers to my id as soon as possible (rajanikanth_peddi@yahoo.co.in) (This is very urgent) Thank You,
As i want some model question paper in basic computer science and history please send me immediately sir
I am shobana from Chennai. I am having my personal interview on 19th Dec at Chennai.kindly mail me the questions to mail id shobana.shanthi@gmail.com
Hi, This is Laila. I am selected for syndicate bank interview. Could you please share your views and the questions asked if you have faced the interview My email id is laila_honey09@yahoo.com Please send as fast as u can.Thank You Thanks... Laila.
How to do cable earhing? whether by grounding Armour to ground or by running extra G.I wire along with cable? which one is preferred mostly amoung them? If the second one is more preferable how many GI wires to be run along with cable (1 or 2)?
Define the overload capacity of the motor?
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.
sir please send me previous year questions of jspl of electrical section through which i could prepare myself fpr the test.