Answer Posted / hannah
Hi,
Maybe your system installed in back date so check actual
movement date. in T-Code MB1C What actual movement date you
used for PG Received into your plant.
Secondly, for assigning a posting period do the following
T-Code OB52
("please check your Company Code is assign to which Varriant
T-code OBBP")
Customizing => Financial Accounting => Financial Global
Setting => Document => Posting Period => Open and Close
Posting Period, and Update your Posting Period as you desire
=> Open and Close Posting Period, and Update your Posting
Period as you desire.
Thank you.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How do you create gl account master data? : fi- general ledger
What is an internal calculation key? : fi- asset accounting
What is done by gr/ir regrouping program?
Why do we create profit centers? What are the key components of profit center? : cost center accounting
Difference between depreciation ,accumulated depreciation and apc? What is apc?
there is a inst named technopad which is giving sap fico training,can anyone tell me that is that a good option for sap training
How do you configure electronic bank statement?
What is a statistical key figure (skf)? : co- cost center accounting
How do you ensure correct balances in the financial statement version? : fi- general ledger accounting
What is the maximum number of posting periods in sap?
open item mgt a/c are all the balance sheet a/c but all balance sheet a/c are not are all openitem mgt plz explain? plz send the mail id rddy786@gmail.com
Name the submodules within fi, from which fi-gl gets simultaneous : fi- general ledger
Is it possible to print the financial statement version on a sapscript form?
What are one-time vendors?
What type of steps comes from Product Costing to CO-PA ?