I Recently faced the interview in SAP SD.Interviewer asked
the what is the serial no in delivery processing?and also
what is the pgi?and what is the configuration for packing?
and what is the relation between plant and shipping point?
Answer Posted / bapu
PGI means Post goods issue i,e; inventory was reduced & the
material are ready for transportation.
after PGI material document will generated as well as
financial document also generated. Value of the stock
reduced & sold material value will increase.
Foe packing, material should be packing relevant.
In material master packing material gr should maintain.
packing material should be created & stock should be
initialize. Material type should be VERP & item category
will be LEIH.
in VL01n after picking & before pGI we have to pack the
material by clicking the packing icon
Plant & shipping point relationship is many to many
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
How many clients we will create in land scape (like in development server, quality server, production server )
What is sap sd?
What is a 'sales order'?
Does sap transportation management have load planning capabilities? : transportation management
What is the data used in shipment scheduling?
Name the necessary steps to setup a route?
pl tell me 3/4 gaps peculiar to any one industry with there solution plz its very urgent
Explain sales document blocking?
What is higher level item category? How it’s controlled?
how we will configure export sales in sd (respect to plants assign and sales process)?
What are the various qualifier option or what are the various import options? : transportation management
How to do customization of rebate processing in sap sd????
what is the diffrence between trade customer and non trade customer .
how you can include condition type in the pricing procedure?
What are the three levels that copy controls are set up? And what are the transaction codes through which it could be done?