I WANT TO KNOW LONGFORM OF CT/PT USEDIN POWER PROJECTS OR
HT SWITCH YARD.
Answer Posted / minal
In power projects, CT stands for current transformer & PT
stands for potential transformer. These transformers are
used for metering purposes.
CT is connected after or before circuit breaker to measure
the current flowing through circuit breaker.
PT is used for measuring voltages of line also.
| Is This Answer Correct ? | 33 Yes | 1 No |
Post New Answer View All Answers
plz send me HPCL apptitude paper.. maulik_elect@yahoo.co.in
How to calculate Voltage regulation of 22 KV Over head Line.
How to decide no. of Step and Kvar for APFC Panel 40 kvar MD: 33.12 KVA Avg pf : 0.8540
what is the acceptable limit value for Desolve Gas Analysis/
what is the pulse and audio frequency transformer? what is different between induction regulators and tap changing transformer?
sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company
what is earthing transformer? draw the winding dia.of earthing transformer.
sir& friends i want the collection of recent quetions asked in interview of top most companies please send me on my email san.jsr@hotmail.com
At what factor resistance r of a conductor depends?
i've iocl interview.. if you know the interview process please give me information..
any idea abt REVERSE METERING concept.........?
is it true there's a big difference in using Cummins or Denyo...especially power output or leakage
I want to ask that is there any relation between current denesity of copper and material purity. also is ther any standard which defines the standard current denesity of material.
what is The difference between national electrical code and I.S.Code (electrical) and what is the value of NEC in electrical engineering field
what do w do when the output of generator is fluctuating?