Answer Posted / joti
4
10-2=8
8-2=6
6-2=4
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
The ratio between the perimeter and the breadth of a rectangle is 5: 1. What is the length of the rectangle If the area of the rectangle is 216 sq. cm?
1/3 of girls , 1/2 of boys go to canteen. What factor and total number of classmates go to canteen.
sadrine's avg on four tests is 80 which of the following cannot be the number of tests on which she earned exactly 80 points
. Which of the following is not a VSAM dataset. a. KSDS b. RRDS c. LSDS d. ESDS
please let me know the minimum qualifying marks in screening test of group1 2010 to be eligible for group1 main exam.
There are three trucks A, B, C. A loads 10 kg/min. B loads 13 1/3 kg/min. C unloads 5 kg/min. If three simultaneously works then what is the time taken to load 2.4 tones?
If DBMDVUUB = CALCUTTA Then BOMBAY = ?
What kind of questions are there in Harbinger Aptitutde test paper(for 2011)and their paper pattern?Plz reply urgently.
what are the possible questions asked for bank po interviews?
what is the number whose reminder is 2 after dividing 5and also reminder is 4 after deviding 7 and reminder is 6 after deviding 9?
A is twice efficient than B. A and B can both work together to complete a work in 7 days. Then find in how many days A alone can complete the work?
Differences you see in private and public bank?
plz send test pattern of nsn engineers graduate.
Refer to the figure below.A ship started from P and moves at a speed of I miles per hour and another ship starts from L and moving with H miles per hour simultaneously.Where do the two ships meet? ||---g---||---h---||---i---||---j---||---k---||---l---|| PG H I J K L are the various stops in between denoted by || . The values g, h, i, j, k, l denote the distance between the ports.
Certain no. of men can finish a piece of work in 10 days. If however there were 10 men less it will take 10 days more for the work to be finished. How many men were there originally.