Why we do design mix of concrete when there is nominal
method using the IS-Code available ?
Answer Posted / arunkumar.t
to save an optimum content of cement, from 7.5 to 8 bags of
cement to 6.6 bags of cement per CuM
Is This Answer Correct ? | 28 Yes | 11 No |
Post New Answer View All Answers
How will you reduce the concrete flow after mixing the concrete
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What tor stands for in tor steel?
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
What is meant by a context menu in a cad software?
how we check the thickness and line of ceiling plaster.
what is mean by reestimation?
What is the Roll of Water Bonding under VDF road?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
How to do rate analysis for concrete work including shuttering work?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
Which is the latest version of solidsworks?