Question { IBM, 28033 }

what is lead time, planning time, planning fence time ?


Answer

lead time is the time for the processing of the total
operation .it is the sum of the setup time,processing time
and tear down time. it is the actual operating time

planning time fence is the time period for which the prod,.
planning cant be disturbed

Is This Answer Correct ?    2 Yes 0 No

Question { 10163 }

What are the main controls in MRP?


Answer

main controls of mrp:
1)net reqmt. calculation
2)lot sizing
3)procurement proposal
4)bom explosion
5)unplanned consumption

Is This Answer Correct ?    0 Yes 0 No