Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1264


How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm

1001


How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir

1025


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

903


I need old MMUP exam question and answer for Civil engineering

1147


foundation details for 25 ton weight Furnace on 2 supports and 2 tilters

1095


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

1510


brickwork labour rate per cum ?

1095


how to calculate mivan shuttering matrial

951


What is missing report and how to prepare

1014


What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?

995


how to calculate the weight of concrete

1015


why the openings of sieves are square io size?

1090


rimmer in pile foundation

2106


How many litres of water used for curing of 1000sqft of slav

1010