I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1394


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1396


How to calculate quanty of steel in four leg stirrups?

1439


for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1464


What is the method of soil replacement test?

1537


Dear Sir What is the Contraction joint for base Slab

1649


Questions related to civil.engg in company

1564


What in your past experience or education prepares you for the position for which you are applying

1687


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

1913


Cement consumption of one cubic meter of aerocon blocks masonry?

3651


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

1511


why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.

1457


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

4562


I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'

2036


what is the painting co efficient of slope roof tiles?

1431