Un-Answered Questions { Aptitude Questions }

How many five digit numbers are there such that two left most digits are even and remaining are odd?

840


If a refrigerator contains 12 cans such that 7 blue cans and 5 red cans. In how many ways can we remove 8 cans so that atleast 1 blue can and 1 red can remains in the refrigerator?

1772


In a cycle race there are 5 persons named as J, K, L, M, N participated for 5 positions so that in how many number of ways can M make always before N?

1205


Jack and Jill went up and down a hill. They started from the bottom and Jack met Jill again 20 miles from the top while returning. Jack completed the race 1 min a head of Jill. If the hill is 440 miles high and their speed while down journey is 1.5 times the up journey. How long it took for the Jack to complete the race ?

1076


There are 1000 junior and 800 senior students in a class. And there are 60 sibling pairs where each pair has 1 junior and 1 senior.1 student is chosen from senior and 1 from junior randomly.What is the probability that the two selected students are from a sibling pair?

826


There are three trucks A, B, C. A loads 10 kg/min. B loads 13 1/3 kg/min. C unloads 5 kg/min. If three simultaneously works then what is the time taken to load 2.4 tones?

884


Complete the series..2 2 12 12 30 30 ?

754


Rahul took a part in cycling game where 1/5 ahead of him and 5/6 behind him then total number of participants?

2644


a, b, b, c, c, c, d, d, d, d, . . . . . . Find the 288th letter of this series?

970


Two persons start walking from the same place in opposite directions. After walking for 4 mts, both of them take the left and walk for another 3 mts. Then what is the distance b/w them?

795


three students appear in a test but no one write there name on answer sheet .and they submitted their sheet to teacher . when teacher distributed their answer sheet . what is probability that no one get their own answer sheet.

707


2 persons can finish a job in 8 days. First person alone can finish the work in 24 days. How many days does the second person take to finish the job?

1093


3 red and 4 blue balls are in a basket. A member of PPTeam is drawing balls from the basket.What is the probablity of getting the 3 red balls simultaneously?

812


6 women can do 75 units of work in 8 days by working 5hrs/day. In how many days can 4 women do 30 units of work by working 8hrs/day ?

1391


A 4" cube is painted in all its faces and then it is cut down into 1" blocks. How many 1" blocks are there even without a single face being painted?

889