Un-Answered Questions { SAP PP (Production Planning) }

What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?

717


What is routing in sap pp?

762


What is opening period?

622


What do we do in realization phase?

669


In lsmw which is most important step?

609


What are gaps? Some examples?

580


How to create object dependencies in a bom for a configurable material?

592


How requirements( pir, sales order, customer requirement) are reduced after they are produced?

771


How is time management and payroll is integrated?

604


We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?

753


What is costing? How it is affected the pp?

637


What is the use of stock requirement list?

630


How the process time is calculated in a wc when both labour, machine categories exist?

604


In project the customization is comes under which phase?

561


How to move to the realization phase?

655