What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What is routing in sap pp?
What is opening period?
What do we do in realization phase?
In lsmw which is most important step?
What are gaps? Some examples?
How to create object dependencies in a bom for a configurable material?
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
How is time management and payroll is integrated?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is costing? How it is affected the pp?
What is the use of stock requirement list?
How the process time is calculated in a wc when both labour, machine categories exist?
In project the customization is comes under which phase?
How to move to the realization phase?