How do y read Sequential file from job control?
project Steps,hits, Project level HArd things,Solved methods?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
In Informatica,for the table I can find coreesponding dependent mappings.Likewise can I find the dependent jobs with all the information by using the table name
why do u need the IOS upgradation in a FC switch
describe the Steps to confiure a Qlogic switch
which r the connectors used in san?
how to connect source to db?generally what r stages u used? how to find the data is having delimiter format?
i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu
if i have two tables table1 table2 1a 1a,b,c,d 1b 2a,b,c,d,e 1c 1d 2a 2b 2c 2d 2e how can i get data as same as in tables? how can i implement scd typ1 and type2 in both server and in parallel? field1 field2 field3 suresh , 10,324 , 355 , 1234 ram , 23,456 , 450 , 456 balu ,40,346,23 , 275, 5678 how to remove the duplicate rows,inthe fields?
how to add a new records into source?
in oracle target stage when we use load option and when we use upsert option?
8000 jobs r there i given commit, suddenly job will abort? what happens? 2)diff b/t transformer stage & filter stage? 3)how to load the data in the source?
How to create a file using vi editor? 2)how to delete a file in vi editor? 3)How to connect the server datastage to unix? what r the command lines we r using? 4)30 jobs r runnig in unix i want to find out my job. how to do this? give me command?
1)s.key generate 1 to 700 records today. tomorrow another 400 will updated how to update the records using s.key generator? 2)source is like :-- DB --> T/F stage1 --> seq1file T/f 1 is linking with T/F2 ---> seq 2 how to load the data? in source i given some conditions those r going in seq1. The another data will going to seq2 how to do this ?