Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Un-Answered Questions { All }

what is your aspiration in profession/ career?

2986


what is your passion?

2070


"Tell me about a job that you found particularly satisfying. What did you like about it?

3170


What do you like LEAST & MOST about your current position?

4398


Describe the environment where you do your best work in an organization?

2172


Hello again!! wanted to ask you HOW EXACTLY create stubs and driver in integration testing? 2.whats the difference between integration testing and system integration testing? Thanks!!

2179


How does the type system works when there is interoperability between a COM and .Net, i mean what exactly happens there

2105


objective of accounting

2040


When we run a GL Reconciliation Report, we also see the void payments in that report. Even though i disable the option of Show Void payments, its appearing in the report.How do i proceed so that i dont see those void payments in the GL Reconciliation Report?

2911


we are Rising contractors(Propritorship concern) and register with "mining of minerals" service. we rise the bills to mine owner (we do not add the service tax in bills) monthly. can we eligable for paid to service tax.

1934


State uses of different types of stsrters with different capacities of motors as below: a. up to 5HP b. above 5hp to 10hp c. above 10hp to 20hp d. above 20hp

2085


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2818


-What shall be short circuit current of LV switchgear for a 1000 kva, 11.415kv, 3 phase tranformer with 5% reactance.

2133


-How do you select cable size for a given load at a given distance from source of supply. How do you find voltage drop.

1800


-What should be minimum value of insulation resistance and maximum value of earth resistance at any electrical instillation and what is method of testing the same.

2100