Define project definition?
What is sap-project system?
How can we set the options for capacity reports cm01?
Is there any way by which we can lock two specific wbs elements say overheads and other expenses, so that the user cannot release pr?
Difference between validation & substitution?
Did you enter a date for field start in structure bi000? The date has to be earlier than today's date.
I would like to know where the batch status can be set in sap. We have the stock type q for quality inspection. We would like stock type r for rework and s for blocked. Where can this be set in sap?
How do I transfer the results from one origin to another origin?
'could not create return delivery wm movement type 102 not allowed for warehouse no. 010'. How do I fix this problem?
How do I use material specification? If I want to use material specification, what are the things I should do?
Which movement types refer to inspection origin 05?
Is there a way to create inspection lot programmatically in an abap report? Is there any business object, function module or user exit? We went to 1 lot for 1 shift. We use inspection origin 89 (manua
Is it possible to cancel the inspection lot once it has been created?
I need some guidelines in maintaining the settings for batch management in qm. What are the customizations necessary for batch management from qm point of view? How the inspection lots get triggered
Is it possible to make the inspection lot quantity to (1) all the time? Can it be configured as an automatic default in qa01? If yes, what are the steps necessary to make a sample size default every t