what is the calculation of raw material for 0.35cum of m-15
What every changes done exist role in development system that changes are not reflected in quality system, but transport is successfully moved?
what are prerequiations when asset master data uploaded in legacy system?
It will be really helpful if someone can provide an example / System behavior where (1) only AC is used, (2) only TOR is used, (3) both AC & TOR is used ( in schedule line category) thank you
our cheque to Arshad Khan was dishonored?
what does mean by kva rating
Can you tell me how to add new column in existing views?how?How is possible?
1)Can we extend /root partition in RHEL 6 ? If yes then what are the steps?
Hi All , in PX Job I have passed 4 Parameters and when i run the same job in sequence i dont want to use those parameters , is this possible if yes then how
Can we quantify bound water by KF titrator ?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
why we are using hexane in calibration of number of drop per mL
Why we make body earthing of transformer and what will be the size of the copper wire for this purpose related to KVA Capacity of the Transformer as per code.
Why we make earth connection with Transformer Body and What will be the minimum size of copper wire as per code with respect to KVA rating of Transformer?