On login window for username and password auto populated field means what !
difference between tds and income tax (India)
How to protect sensitive loads such as Dosing pumps inside a factory from voltage surge/voltage fluctuation.
What are the responsibilities of administrative officer in some educational institutions
write the value of x and y after execution of the statements: int x=19,y; y=x++ + ++x; x++; y++;
Explain your project of banking domian.
Does outdoor isolator loose connection cause short circuit current in that circuit? if yes then how ??
Hallow everybody, we want to know in a NPk fertilizer process plant (Bulk Blender) we are in doubt if use square or rectangular hopper jus to avoid the vault effect durin the flow of of raw material like Phosphorus, Potasium and zeolite..Please any advise will be appresated Isdray
why you are using proxy adapter and why you are not using idoc and rfc adapters ?
All aptitude question of Bechtel
Can any one solve this one?? **A server configuration is controlled from a single web page with multiple options: 20 drop-down menus, with 3-4 options each. 5 check-boxes. 1 multi-select menu, with 5 options. 1 template selection, with 6 options: A, B, C, D, E, F. o When options A, B, C, D are selected, all options (#1-#3) above are available. o When options E, F are selected, only 10 out of 20 drop-down menus have an effect. Besides item #4, developers input is that all options are independent, I.e., not impacting each other. What is the required number of test configurations required in order to test the server configuration and release in good quality: Assuming first release. Assuming regression tests for release with new features not impacted by the above options. Test configuration is a complete set of options that were selected to be tested in one complete server configuration scenario. I.e, a test configuration is set of 17 or 27 specific options tested together.
why we shrink our body during cold
List out the the types of Mounting Light fixture?
i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.
how can i find cable size from current rating?