What is the difference between ISA Board & STM-1 in SDH
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Hi, My plant daily consumption is calculated as 3.8MWH but my supplier has sanctioned an power of 2.6MW per day. how can i equal or distinguish this two factors
.php|
'documenˁ
I WANT SECURITY PAPER MILL, HOSHANGABAD TEST PAPER.KINDLY SEND TO MY MAIL ID
how i can Design a client–server network with two servers operating at 100Base- T Fast Ethernet speed and the clients operating at regular 10Base-T Ethernet speed using a 10/100 Mbps NIC. The hub is located in a wiring closet, but the servers and clients are not. Assume that a satisfactory performance is achieved at 40% utilization of the LAN.
Draw network configuration and protocol layer interface architecture for a multiprotocol bridge that interconnects an Ethernet LAN to a token-ring LAN.
IF DISTANCE IS 100METERS B/W AMP.METER AND CURRENT TRANSFORMER WHAT WILL BE AFFECT IN ACCURACY .METER CAN SHOWING ACCURATE CURRENT OR NOT IF NOT WHAT CAN I DO TO GET 100% ACCURACY.
what are factors to be consider in electrical installation like load factor,diversity factor .....
What tests should i carry over on a newly rewinded DC Generator with voltage rating of 38 volts and current rating of 350 amps, to certify that the machine is OK?
what is LSR?
Hi I have cleared supreme court written exam . Now I have to give computer test so please tell me which type of que will come in exam.Thanx
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What is the difference between the photochemical reaction and photo-dynamic reaction?