How can i prepare MIS report for Finance?
What is the GDP growth?
What is accounts payable?
What is compensation theorem?
How to test whether the application is having memory leakage using task manager and PerfMon. Please tell if any one know. thanku
some time we open engine breaker 8.0 MW load but plant not trip. and another time engine open 4.0 MW load engine trip why? individually engine breaker open & individually emergency stop why difference?
how to develop the submit and search operations in single jsp using struts?
Name of the cipla medicine product
what is the difference between isdn and idn?
all subject of 3rd sem llb
IN KARL FISCHER TITRATION WHAT IS ONE COMPONENT & TEO COMPONENT SOLUTIONS?
Hi, I want to do asp.net certification. So please guide me how i can proceed.
what happens at an equipment buyoff?
what's accounts payable
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,