Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB Machines of higher rating?
Is it required to do earthing in 2nd shop if earthed armoured cable is laid from 1st shop ?
What will be advantage if we put some load in neutral of grounded star transformer & loadshortcircuit current,rated current of cable & MCB with example?
What is the difference between shortcircuit current, rated current of cable & MCB with example? What will be the size of cable required for 5.5 KW motor (Full load current 10 Amps approx.), Starting current with DOL is 120 Amps. Aprrox. Short circuit current with LLLG fault is 2000 Amps Approx.
Where can I get CPWD electrical specifications & Shedule of rates? Please help me
How to design the no. of ceiling fans required in 5mtr X 10 mtr X 3 Mtr hight room?
What is the de rating factor of cable? What is the importance of the de rating factor in cable selection?
What is size 00, 01, 1 etc., in HRC fuse types?
What is the meaning of 40X8X2 busbar dimensions for carring load of 400 Amps
What is the working principle of CFL & T5 tube light & 40W tube light with electronic ballast?
1)How to calculate AC Capacity for the Room?
What is diff b/w TON and BTU for Air conditioner?
Hi i am going to attend Deputy Architect interview in Telecommunication Dept. through UPSC I dont know the type of questions they will ask. I will be very thankful if anyone could help me. Please send to my email-id ganesh_dev@rediffmail.com Please any one have experience of some other Dept., please reply me. my interview in on 10th of Nov. only 5 days left. please help.
if i want to limit the condition record validity for forst 10 orders how can i do tht plz ans i hve interview in 2/3 days