Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Topic :: Pole





Pole Interview Questions
Questions Answers Views Company eMail

For a stable system, where should the poles of a system be in a root loci plot?

GE,

1178

You are project manager for an engineering company. Your company won the bid to add ramp-metering lights to several on-ramps along a stretch of highway at the south end of the city. You subcontracted a portion of the project to another company. The subcontractor's work involves digging the holes and setting the lamp poles in concrete. The subcontractor's performance is not meeting the contract requirements. All of the following are valid options except: A. You document the poor performance in written form and send the correspondence to the subcontractor change request through Contract Administration. B. You terminate the contract for poor performance and submit a change request through Contract Administration. C. You submit a change request through Contract Administration to ask the subcontractor to comply with the terms of the contract. D. You agree to meet with the subcontractor to see if a satisfactory solution can be reached.

932

You are a project manager for an engineering company. Your company won the bid to add ramp-metering lights to several on-ramps along a stretch of highway at the south end of the city. You subcontracted a portion of the project to another company. The subcontractor's work involves digging the holes and setting the lamp poles in concrete. The subcontractor's performance is not meeting the contract requirements, because the poles are not buried to the correct depth. Which of the following is true? A. You are in the Quality Assurance process and have performed a quality audit to assure correctness of work. B. You are in the Scope Verification process and have performed a quality audit to assure correctness of work. C. You are in the Contract Administration process and have completed a contract audit to assure the subcontractor's performance meets the contract requirements. D. You are in the Performance Reporting process and have completed a performance review of the contractor's work.

1080

What is dipole?

1099

If a polar molecule has a charge of 4.8 * 10^ (-10) and internuclear distance is 1A then what is its dipole moment?

1009

What are the animal pole and the vegetal pole of the vertebrate egg?

5

What is pole of the system?

1091

Why an ac solenoid valve attract the plunger even though we interchanges the terminal? Will the poles changes?

1156

explain the process of commutation in a dc machine. Explain what are inter-poles and why they are required in a dc machine.

1116

Explain what are inter-poles and why they are required in a dc machine.

1042

What is a dominant pole?

1113

Explain vegetal pole?

1

Explain foetal pole?

1

Explain animal pole?

1

What is the dipole moment of chlorooctane?

1132




Related Topics


Un-Answered Questions { Pole }

When was Napoleon Bonaparte crowned Emperor of France? Which of his wives was great fashion leader and icon of the day?

2407


hi,iam learning testing tools in mindq.i want to put 2+exp. is there any problem with that. tell me what are the Interview questions for experienced peopole. please give me the answer. thanq

2910


I got some information from the QTP help.But i am not sure whether through this process will QTP work or not bellow is the Help what I have Remote setup Settings Remote WSH, which is a new technology included in WSH 5.6, provides the ability to run a script on a remote machine or machines. With Remote WSH, the script is physically copied from the local machine to the remote machine before executing. In order to enable Remote WSH functionality, you must first set up the remote machine with the proper security settings. The steps below perform the tasks that enable Remote WSH. Note Both the remote and local machines must be running Windows NT 4 SP3 or greater in order to use Remote WSH. To enable a machine to run remote scripts 1. Install WSH V5.6 on the machine. If you are using Windows 2001 or have installed Internet Explorer 6 or greater, WSH 5.6 has already been installed. Note WSH 5.6 is available for download from the web at http://msdn.microsoft.com/scripting 2. Add yourself to the remote machine's Local Administrators group. 3. To enable Remote WSH, use Poledit.exe on the server. Note An administrator who wants to enable Remote WSH must either acquire the Windows 2000 resource kit, or use http://msdn.microsoft.com/scripting to acquire the necessary windowsscript.adm file that contains the WSH settings. The windowsscript.adm file must be copied to the server that sets the gapplicabel group's policies. Although it is not necessary to copy the file to the server's \WINNT\INF directory, this is nonetheless where the default adm files are located. Note For more information on Poledit.exe, see the Poledit.exe's online help system. 4. WSH should now be enabled on the machine. To test it,. WSH 5.6 can run scripts that reside on remote systems. The following scripts demonstrate this capability. These scripts make the assumption that the files are located on a local machine directory called "c:\wsh5.6"; change the local path and the remote machine name as necessary. After initially running RemoteTest.WSF on the local machine, there may be a small pause as DCOM verifies your identity. After you see the "Done" message, a file named "c:\beenhere.txt" on the remote machine indicates the time that you executed the command (from the remote computer's clock). Script to run scripts remotely set oController = CreateObject("WSHController") set oProcess= oController.CreateScript("c:\wsh5.6\beenhere.wsf","remmachine") oProcess. Execute Could you tell me will it work fine

2236


how we calculate the dick for a pole?

2133


Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???

1928


how does the rotating m.m.f is produced in the 3-phase induction motor and how the poles are created in 3-phase induction motor ?

2591


Can 4pole (3 phase+neautral )RCCB proper functioning in only 3 phase load (no neautral, no Earth) ?

2084


what is 400kv doble circuit quadpole tower?

1895


Does magnetomonopoles exists? one maxwell equation strongly suggests no, but how about their existance in plasma?

1952


Dear sir How are you? i am jordanian female live in saudia arabia my student visa got refused 2 times my question is should i replay agian in jordan or saudia arabia my last time was 5 months ago and should i aplay for college or english institute? and should i take tofel test first do u think does the tofel help or doesnt matter please i need your help some pepole told me if i got refused once i will never get my visa is that right? thanks alot

2159


There are 90 cows and 9 poles.you have to tie cows to pole such a way that each pole is tied with odd number of cows and no pole should be left empty?

10147


Hi everyone. Some Generators uses 3-Pole breakers with extra contactors for Neutral. Some uses 4-Pole. Why so? What is the idea behind this? Thanks in advance for the solution. Kr.

2018


I have an existing old MCCB. ABB Model SACE, the rating are: Ue = 660 volts, Iu =1250 Amps, 3 poles, Ith (max) =800 amps at 45 deg C. I need a circuit breaker for my 3 phase motors, 380 volts 60 hz. the supplier required the minimum ampacity of the breaker to be 911 amps. can i use this breaker with rating of Iu =1250 amps but Ith = 800amps maximum?

2252


What are the components connected in between the power supply coming from an electric pole to HT & LT Panels in a large commercial building or how the power supply connected from Electric pole to Transformer & then to the HT & LT panels of a building? Please send me answers via mail, my id is yogiagarwal@gmail.com. If possible, please give a line diagram.

2022


Some time when i wanna learn the object i face issue like i am not able learn the object in proper manner... eg:for text bo on web page it should learn as webedit but some times it reads as winobject:internetexpoler-server, because of this i have to uninstall the qtp and re-install it again when i do this it reads the object perfectly.....plz suggest the soln

1832