what advice do you have for Architectural Draughtsmanship
student who wish to became architects?
FROM THE WHICH FONT USED MEANS SMALL SIZE TEXT IN A0 SIZE PAPER, NEED TO SITE EXECUTION PURPOSE DRAWING DRAWING NEED TO TAKE PRINT IN A3 SIZE ALSO MEANS WHICH FONT USED MEANS POSSIBLE TO READ BOTH PRINT
Is there any information about building environmentally in the retarded South. (SC)?
how much steel is required for 1100 sqft of slab (area 25*43 ) & we need to consrtuct 3 floor
what is advantages and disadv.of e-banking.
what is Byzantine Architecture?
What is a buttress? How is it different from a flying buttress?
how to measure 4mm,6mm,12mm,18mm plywood into a cubic meter and how many layers in a cubic meter
0 Answers HCL, ITI, MSCB, Vishal, Wood Paker,
what so you want to work?
What details do you notice about the way this building is constructed? How does it differ from your own home?
I am Planning to Contruct a floor appartment on my own thro a Contractor . How to estimate the Constrction Cost , to negociate with the Contractor.
1meter=?
RCC colums of 15"X9" each, roof height 20.5'ft, total pillars 36 nons. Span between pillar to pillar is 16/20/20 length wise and 16/14 width wise. Total Slab area 8000 sft and plinth area is 1900 sft. beams are 12"X9". kindly calculate load factor per sqft.